how does hybrid home energy installation work?

shop our all-in-one hybrid installation service
— a complete turnkey hybrid home energy solution

ECO-WORTHY 16kWh Hybrid Energy Storage System with 6kW Single Phase Hybrid Inverter

Installation for Just £1,000

one click to get started. we take care of the rest.

£4,699.98
£5,199.98
Style
VIEW MORE

Outdoor installation note: The battery cannot be installed outdoors without a custom waterproof enclosure. If outdoor installation is required, the enclosure is estimated to cost an additional £400–£600.

ECO-WORTHY Hybrid System Installation Process

Within 24 hours

Order Your Installation Package

Purchase your eligible hybrid system with installation service. Within 24 hours: Our UK service team will contact you to confirm your address, installation details and arrange the next steps.

Within 2 weeks

Site Survey & DNO Application

Following our initial consultation, we will arrange for an MCS-certified installer to visit your property within two weeks to carry out a site survey and collect the information required for the DNO application.

If the site meets the requirements, we will assist with submitting the DNO application and the required documents.

Within 2 weeks After DNO Approval

Professional Installation

Once DNO approval has been received (typically within two weeks, although the exact timeframe may vary by local network operator), your installation will be scheduled within two weeks. Your MCS-certified installer will complete the full system installation, including wiring, G99 commissioning, system testing and system setup.

Submit your details after ordering. We’ll contact you to arrange the next steps.

Installation Consultation Form

Frequently Asked questions

Contact Us

why choose a hybrid inverter?

A hybrid system gives you more control over your energy. Use your solar power first, store what you don't need, use the battery when electricity is more expensive, and export surplus energy when available. That means less reliance on grid electricity, greater control over your energy costs, and the potential to earn from surplus power.

is the £1000 installation price fixed, or could i be charged more later?

includes standard installation and dno application only. if additional work is required, such as extensive rewiring of an older property or integration with an existing system, additional charges may apply depending on the actual requirements.

what's included in the £1000 fit

• Site survey by an MCS-registered electrician before any price is fixed  
• DNO notification and G99 application handled on your behalf  
• Full installation, commissioning and system testing  
• Cabling dressed and tidied by our own installers  
• Walkthrough of the system and app before we leave site

does eco-worthy carry out the installation directly?

ECO-WORTHY coordinates your installation service through our UK-based service team and can connect eligible projects with suitable professional installers. The actual installation is carried out by the appropriate qualified/certified installer.

will someone visit my home before installation?

Yes. For installation-service orders, the process includes a site assessment before the final installation is confirmed. We'll let you know what needs to be prepared before the installation date.

can i buy the equipment without installation?

Yes. Customers who already have a suitable installer can purchase the equipment separately, subject to product availability and system suitability.

how long does it take from booking to switch-on?

The exact timeframe varies by location, so we cannot guarantee a specific timeline. We’ll contact you as soon as possible after your order. The main factor is the local DNO and installation approval process, which varies by area.

what happens if i have an equipment or installation issue after installation?

Your installation is supported by our UK service team, while the equipment is covered by the ECO-WORTHY warranty.

If something goes wrong, just contact us first. We'll help identify whether the issue relates to the system or installation and coordinate the appropriate support.

home energy storage service line

service

UK-based team, MCS-registered electricians, and a single number to call before and after your installation.

contact

Helpline:   01615649562
serviceuk@eco-worthy.com
Mon–Fri, 9.30---15.00 GMT

assurance

MCS-registered installers
G99 & DNO paperwork included
5-year warranty
14-day money-back guarantee